Fourth week
In the fourth week, we have completed the whole connection, there are something else we have done shown in the following:
1) Complete the design of the home;
2) Test the program of LCD part;
3) Set the circuit in the model.
Actually, the fingerprint system had many issues when it was tested in the circuit connected. Additionally, the program for the LCD part went wrong, there was nothing shown on the screen. At first, we thought the reason is that the model number is different with that in the program. But after testing for many times, the mistake was found in the connection of the UNO board and the LCD. For the design, the material for the home was not so satisfied as we hoped. Sometimes it is difficult to keep the setting tidy and functionality togther.
Next week we are going to complete the setting and start to do the poster. The project will be finsihed in the next week.
In the fourth week, we have completed the whole connection, there are something else we have done shown in the following:
1) Complete the design of the home;
2) Test the program of LCD part;
3) Set the circuit in the model.
Actually, the fingerprint system had many issues when it was tested in the circuit connected. Additionally, the program for the LCD part went wrong, there was nothing shown on the screen. At first, we thought the reason is that the model number is different with that in the program. But after testing for many times, the mistake was found in the connection of the UNO board and the LCD. For the design, the material for the home was not so satisfied as we hoped. Sometimes it is difficult to keep the setting tidy and functionality togther.
Next week we are going to complete the setting and start to do the poster. The project will be finsihed in the next week.